Auberge de Mer demolition at marina on hold for now

MARIGOT--The Collectivité is still faced with the problem of finding alternative locations for the businesses still operating in the condemned Auberge de Mer building at Marina Port La Royale, and consequently demolition of the building is on hold for now. 

  Asked about this situation, President Gibbs said at a recent press conference: “I’ve always said we can’t proceed with construction or demolition without solving certain situations. It’s not easy to put these businesses into the same working conditions that they enjoy today, but we are working on it with SEMSAMAR to find alternative locations. In fact, we have found a couple of solutions that we will be proposing to the businesses shortly.”

  The first idea to move the businesses into small containers in the adjacent car park was rejected by the businesses as being unworkable. The businesses were originally given two months to vacate the building in October 2018 after the building was deemed to be “in peril.”

  The building is to be replaced by a new marina investment project. However, the businesses went to court to try and win more time to find other locations.  Since then nothing has happened, the businesses are still there and demolition work that was taking place in vacant parts of the building gradually stopped.

 

 

The Daily Herald

Copyright © 2020 All copyrights on articles and/or content of The Caribbean Herald N.V. dba The Daily Herald are reserved.


Without permission of The Daily Herald no copyrighted content may be used by anyone.

Comodo SSL
mastercard.png
visa.png

Hosted by

SiteGround
© 2025 The Daily Herald. All Rights Reserved.